Install a drip edge around the perimeter of the roof.
Roll roofing installation step by step.
Plan so that no two butt joints are closer than 2 feet from each other.
This aluminum flashing protects the edges of the roof sheathing.
Step by step roll roofing installation 1.
Install drip edge and install 9 cant strips of roll roofing material along the rake and eaves edges gable ends and lower roof edge such that the roofing strip overhangs the roof deck by 1 4 to 3 8.
Installing the rolled roofing 1.
Along the eave measure 35 1 2 inches and run the chalk line along this point.
If the plumbing vent is close to the peak of the roof lap the shingles over the peak of the roof.
How to do it attach first course.
Prepare a valley between joined roofs by cutting a strip that is 18 inches wide and covers the entire length of the.
Using a measuring tape measure 35 inches 89 cm up from.
10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Cut the shingles to fit around the flange s dome.
This should give you a 1 inch overhang on the eaves including the top edge of.
Step 1 draw the base line for you to have a basis on where to proceed with the installation of roof rolls create a line to serve as a mark.
2 like any other roof project you should start this one by addressing the valleys.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.
Roll out and cut roll roofing to cover the length of the roof.
Adhere the shingles adjacent to the flange with roofing tar.
Apply roofing cement to the roof.
Prepare roof edges cant strips.
To seal a plumbing vent spread roofing.
Cut the rolled roofing.
Use a trowel to scoop up the roofing cement.
Place the top edge of the roofing along the chalk line.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a.
Mark a chalk line to identify the end of your first layer.
The line will serve as the guide where the first metal sheet will be installed.