Screw line spacing for metal roofing over metal purlins this will depend upon the type of panel that is used and the thickness of the steel.
Purlins spacing for metal roofing.
By the standard the most used placement of purlin span for metal roof is five foot intervals.
For 2x6s purlins the posts are spaced in 6 feet distance.
The metal roofing panels shown in this manual require a mini mum slope of 2 per foot to ensure proper drainage.
Refer to the rain.
Without a set of blueprints with a pe s seal you have no option but to follow the inspectors gig.
Fyi we run purlins on 3 5 feet on center depending on size of purlin.
Purlin spacing is dependent on profile of the metal and gauge plus snow and wind load plus what the rafters are designed to carry.
If the space between posts is greater than 8 feet then brace is needed to avoid buckling.
What do i need to know about installing purlins for my metal roofing project.
Purlins fabral recommends a maximum spacing of 24 on center note that 5v requires solid decking.
Purlin spacing for metal roofing.
For heavier material such as gage steel the metal roof purlins spacing length could go up to 4 feet.
Purlins need to follow the sides edges of the roof it is important to note that in addition to the.
Doubling up in the valleys refer to the installation manual for the proper on center spacing and be sure that the.
However it is important to note that expected load is a crucial factor while determining this.
Once the purlin spacing is determined then the metal roofing panels are typically attached to every line of purlins.