Purlin spacing for pvc corrugated roofing.
In heavy snow areas 500 series or greater panels are recommended and closer spacing of purlins should be considered.
In order to install your plastic roof correctly and prevent leaks you.
In the valleys due to the angle typically produced at the valley and the use of transition flashing it is essential that the purlins are doubled in the valleys that is two purlins side by side on each side of the angle of the valley.
Overhang at eaves should not exceed 100mm and be less in high wind areas.
Corrugated plastic roofing is a long lasting and low maintenance alternative to corrugated metal roofing.
Purlin spacing should suit the end laps required for the size of sheet to be used.
For the lighter material such as lightweight aluminum the common spacing length is 4 inches of clear gap.
While panels may not fail under heavy snow loads strain at fastening points can cause slight cracking.
For heavier material such as gage steel the metal roof purlins spacing length could go up to 4 feet.
You can use both types of corrugated roofing together creating panels that will allow light to come through as with a clear or white fiberglass corrugated panel known as a skylight.
Step 3 purlin spacing.
Purlin batten spacing s please refer to table for purlin batten spacing s.
The overlaps ends and sides depends upon the sloop of the roof see below.
Doubling up in the valleys refer to the installation manual for the proper on center spacing and be sure that the purlin is attached to the roofing truss.
Non accessible roof and intermediate 1 600 2 400 1 500 2 100 wall cladding type 3 end 1 100 1 600 1 000 1 400 maximum recommended purlin intermediate 0 900 1 500 0 800 1 200 spacing for standard roof end 0 600 1 000 0 550 0 800 see notes below.
Endlap at battens or purlins should not exceed 200mm to reduce.
For the greca profile 900mm first and last and 1200mm for the intermediates.
Spacings should be reduced to 750mm maximum end spans in areas exposed to high winds.
Plastic is much lighter and easier to work with making it popular with homeowners looking to save money that could be spent hiring professional installation teams.
Suntuf is supported on the structure via purlins these are the bearers that run left to right along the width of the roof the maximum purlin spacing for the corrugated profile is 800mm centres on the first and last purlins and 1 meter centres for the intermediate purlins.
The typical spacing standards for residential and commercial buildings are about 1 to 2 foot.
Installing translucent plastic corrugated roof panels.